Kealy Construction completed routine Duracem floor maintenance at Apple Fashion Valley over a three-night program. Our certified crew executed a full back-of-house refresh — surface cleaning, controlled abrasion, application of Duracem maintenance coats, and final cure verification — delivering a uniform finish across the entire BOH footprint. Duracem flooring installation, maintenance, and repair is one of our core specialties, and we have the trained personnel and equipment to keep these high-traffic surfaces performing to Apple’s standards.
All work was scheduled and executed during overnight hours to keep the store fully open for business each morning. Adjacent finishes, fixtures, and storage areas were protected throughout, and the space was returned cleaner than it was found ahead of opening on the final day.