Skip to main content

Kealyconstruction

Apple Mission Viejo Floor Repair

Kealy Construction performed a complete Duracem floor maintenance program at Apple Mission Viejo across three overnight shifts. Our certified crew handled the full sequence — deep cleaning, mechanical surface preparation, repair of localized wear, application of Duracem maintenance coats, and a final finishing pass — restoring a consistent, durable surface throughout the back-of-house area.

Before/after documentation was captured at each stage to verify scope and quality. All work was completed during off-hours so the store remained fully operational each business day, with adjacent finishes and equipment protected throughout the work and the space returned to a turnover-ready condition before opening.

Before

During the Project
After